Granite China · Granite Receiving Inspection Record
1. Delivery identity
- Order / supplier / stone name
- Delivery date / time / receiver
- Carrier / consignment / seal reference
- Crates expected / received
2. Photos and checks
- Crate and label photo filenames / references
- Piece counts expected / received / inaccessible
- Edges and corners: condition / pieces affected
- Colour range against approved samples / reference ID
3. Damage log
Use piece and crate IDs; attach a numbered continuation sheet if needed.
| Crate / piece ID | Location and condition | Photo reference | Action / hold status |
|---|---|---|---|
- Claim notice deadline / contract or carrier reference
- Who was notified / when / how
- Receiver signature / date
Check the actual notice deadline promptly. Keep damaged pieces and packing where safe; do not install disputed pieces while their condition is unresolved.